Project

Paracel Water Treatment Package (Paraguay)

mappa_paraguay
Water Treatment
Water Treatment
Paracel Water Treatment Package (Paraguay)
Process

Water treatment plants

Duration of the project

2023 - in progress

Client

Paracel SA

The scope of the contract is the construction of three Water Treatment Plants that will serve as auxiliary systems the pulp production facility of Paracel S.A., which will be able to produce 1.8 million tons of cellulose per year.

The contract, to be carried out with the EPC (Engineering, Procurement, Construction) formula, involves the construction of:

Water treatment plant (ETA), to serve the factory with a treatment capacity of 7,000 cubic meters of water per hour
Boiler feedwater treatment plant (ETAC) a plant capable of producing 1,350 cubic meters per hour of demineralized water to feed the boilers;
Wastewater treatment plant (ETE) - a plant for the biological treatment of discharge waste water with a treatment capacity of 6,600 cubic meters of water per hour.

The three plants will all serve the industrial complex located along the Paraguay river, near the city of Concepción.

Capacity